NHBC Standards 2010

8.2 Wall and ceiling finishes

Appendix 8.2-A
   Dry lining to receive ceramic wall tiling

Appendix 8.2-A

Dry lining to receive ceramic wall tiling

Description Board thickness
mm

Support centres
mm
Additional support Max. height
mm
Comments
Timber frame 12.5, 15
400 to 450

600
No

Timber noggings 600 mm centres vertically
3600

3600

Timber battens 12.5, 15
400 Battens at head, base and intermediate positions not exceeding 1200 mm centres 3600
Direct bond 9.5
450
dabs of adhesive in rows
Horizontal dabs at mid-storey height 3600 Complete at least
10 days before tiling
Direct bond
(Thermal laminates)
12.5, 15
600
dabs of adhesive in rows
Horizontal dabs at mid-storey height 3600 Complete at least
10 days before tiling
Metal furring 12.5, 15
400
metal furring sections
Metal furring stops at head, base and intermediate positions not exceeding 1200 mm centres 3600 Complete at least
10 days before tiling
Resin base adhesive
(Thermal laminates)
All
Blob of sealant 9 nailable plugs per board

Independent steel stud lining

48 mm

60 mm



2 x 12.5

2 x 12.5




400





Mid-point support

Mid-point support



3000

3600

48 mm metal stud partitions





70 mm metal stud partitions





146 mm metal stud partitions
15

2 x 12.5 each side
2 x 15 each side

15

2 x 12.5 each side
2 x 15 each side

2 x 15 each
side

400

400




400

400




600














Additional stud at 300 mm up to tile height
2700

3600
3600



3600

3600
3600



3600

Prefabricated gypsum wallboard panel partition 57
63
} Normal specification
2700
Laminated partition 50
65 
} Normal specification
2600
2800
Complete at least 10 days before tiling