B |
|
Backfill |
5.1, M7, S2, S4, S5, S6, D17 |
Basement constructions |
5.1, D16 |
Bearing capacity of ground |
D4, S3 |
Blinding |
5.1, S6, S7, D12 |
Blockwork |
D6, M2 |
Brickwork |
D6, M2 |
C |
|
Cold bridging |
D14 |
Concrete |
5.1, D5, D6, M2, M8, M9, S2, S5, S6, S7, S8, D10, D12, D15, D16, S10, S11 |
D |
|
Damp-proofing |
5.1, S7, D11, S11 |
Damp proof course |
5.1, S9, D13 |
Damp proof membrane |
5.1, M8, S8 |
Depth of infill |
D3, D4 |
Drainage |
5.1, D4, D5, S2, D12, D16 |
E |
|
Expansive materials |
5.1, D4, M7, S5, D10 |
F |
|
Fill |
5.1, D3, D4, D5, D6, D7, D8, D9, M6, M7, S2, S3, S4, S5, S6, S7, D10, D11, D12 |
Floor slab |
5.1, S4, S5, D10, D11, D14 |
G |
|
Ground conditions |
5.1, D3, D4, D16 |
Ground hazards |
D4 |
Ground moisture |
S8, D12 |
H |
|
Hazardous fill |
5.1, D8 |
I |
|
Insulation |
5.1, M5, M6, S2, S9, D13, D14, D17, M10, M11, S10 |
M |
|
Masonry below dpc |
5.1, M1, M3 |
Mortar |
5.1, D6, M2, M3, S5, D10, M12 |
N |
|
Nature of ground |
5.1, D4, S3 |
NHBC approval |
5.1 |
P |
|
Proprietary mortar |
5.1, M3 |
Provision of information |
5.1, D16 |
S |
|
Services |
5.1, D4, D5, S2, D16, D17, S11, S12 |
Site-mixed mortar |
5.1 |
Sloping ground |
D4 |
Statutory references |
D14 |
Statutory requirements |
5.1, D1, D2, D14 |
Sulfate resistance |
M3, S5, D10 |
Surface water |
D5 |
T |
|
Tanking materials |
5.1, M9, M10, S12 |
Test requirements |
5.1, D9, M7 |
Thermal insulation |
5.1, M6, S9, D13, D14, M11, S10 |
Transfer of loads |
5.1, D2 |
Typical details |
5.1, S12 |
W |
|
Wall ties |
5.1, M4, M5, S2, D14, S10 |
Walls below dpc |
5.1, D4, D5, D6, D7, M2, M6, S1, S2, D14, D17 |
Water pressure |
D12 |
Waterproofing |
5.1, D16, S12 |