NHBC Standards 2011

INDEX

B
Backfill 5.1, M7, S2, S4, S6, D17
Basement constructions 5.1, D16
Bearing capacity of ground D4, S3
Blinding 5.1, S7, D12
Blockwork D6, M2
Brickwork D6, M2
C
Cold bridging D14
Concrete 5.1, D5, D6, M2, M9, S2, S5, S6, S7, S8, D10, D12, D15, D16, S10, S11
D
Damp-proofing 5.1, S8, D12, S11
Damp proof course 5.1, S9, D13
Damp proof membrane 5.1, M8, S8
Depth of infill D3, D4
Drainage 5.1, D5, S2, D12, D16
E
Expansive materials 5.1, D4, M7, S5, D10
F
Fill 5.1, D3, D4, D5, D6, D8, D9, M6, M7, S2, S3, S4, S5, S6, S7, D10, D11, D12
Floor slab 5.1, S4, S5, D10, D12, D14, D15
G
Ground conditions 5.1, D3, D4, D16
Ground hazards D4
Ground moisture S8, D12
H
Hazardous fill 5.1, D9
I
Insulation 5.1, M6, S2, D14, D17, M11, S10
M
Masonry below dpc 5.1, M2, M3
Mortar 5.1, D6, M3, M4, S5, D10, M12
N
Nature of ground 5.1, D4, S3
NHBC approval 5.1
P
Proprietary mortar 5.1, M4
Provision of information 5.1, D17
S
Services 5.1, D5, S2, D16, D17, S11, S12
Site-mixed mortar 5.1
Sloping ground D4
Statutory references D14
Statutory requirements 5.1, D2, D14
Sulfate resistance M3, S5, D10
Surface water D5
T
Tanking materials 5.1, M10, S12
Test requirements 5.1, D9, M7
Thermal insulation 5.1, M6, D14, M11, S10
Transfer of loads 5.1, D3
Typical details 5.1, S12
W
Wall ties 5.1, M5, S2, D14, S10
Walls below dpc 5.1, D4, D6, D7, M2, M6, S2, D14, D17
Water pressure D12
Waterproofing 5.1, D16, S12